Shuswap, 1 hour 15 minutes from Kelowna
Epoxy flooring
Salmon Arm
Coating and polishing through Salmon Arm and the Shuswap, Hillcrest, Broadview, Canoe, Gleneden and South Canoe, from lakeside garages and boat storage to dairy and food-processing floors.
- Garage floors from
- $8/sq ft
- Neighbourhoods covered
- 6
- Systems available
- 8
What we see on Salmon Arm slabs
For a Salmon Arm garage or food-production floor, note how wash water or vehicle meltwater leaves the building. Include drain locations, cleaning practices and any recurring condensation so moisture and access requirements can be assessed before scheduling.
Systems we install in Salmon Arm
Garage Floor Coatings
Attached and detached residential garages
$8-$12/sq ft · 2 days
Metallic Epoxy Floors
Showrooms, retail and salon floors
$12-$18/sq ft · 3 days
Flake Epoxy Systems
Garages, shops and mechanical rooms
$8-$12/sq ft · 2 days
Polyaspartic Coatings
Homeowners who cannot lose the garage for three days
$10-$15/sq ft · 1 day
Polished Concrete
Retail, restaurants and commercial interiors
$6-$14/sq ft · 3-5 days
Commercial & Industrial Epoxy
Warehouses, distribution and manufacturing
$6-$14/sq ft · 2-5 days
Quartz Broadcast Systems
Commercial kitchens and food processing
$11-$16/sq ft · 3-4 days
Concrete Repair & Surface Prep
Slabs being prepped for any coating or polish
$2-$6/sq ft · 1-2 days
Neighbourhoods we work in
Salmon Arm. FAQ
Does Apex Concrete Coating Ltd. serve Salmon Arm?
Yes. Apex is based in Kelowna and works throughout Salmon Arm and the wider Shuswap, about 1 hour 15 minutes from Kelowna. Confirm site-visit availability, travel and the written scope for your location.
How much does an epoxy garage floor cost in Salmon Arm?
A full-flake epoxy system with polyaspartic topcoat runs $8-$12 per square foot in Salmon Arm, so a standard 2-car garage of about 500 sq ft is $4,000-$6,000. These are indicative planning figures. Preparation, access, travel and the selected system affect the written quote.
How long does a coating job take in Salmon Arm?
Two days for a standard flake garage floor, one day for a full polyaspartic build, and three to five days for metallic, quartz or polished concrete. For commercial work in Salmon Arm, discuss overnight, weekend or phased access. The selected products and site conditions determine when each area can reopen.
What documentation should I request before work starts?
Ask for the insurance, licensing and workplace coverage documents relevant to your project, along with the written scope and any product-specific warranty terms. Confirm these before booking.