North Okanagan, 45 minutes from Kelowna
Epoxy flooring
Vernon
Discuss a Vernon project with Apex, including residential garage coatings and commercial work across East Hill, Coldstream, Predator Ridge and Okanagan Landing.
- Garage floors from
- $8/sq ft
- Neighbourhoods covered
- 6
- Systems available
- 8
What we see on Vernon slabs
For a Vernon or Coldstream renovation, photograph damaged edges, old paint and repairs before requesting a price. If the floor must remain partly accessible, include a sketch of the available work zones and the vehicle or stock movements that cannot stop.
Systems we install in Vernon
Garage Floor Coatings
Attached and detached residential garages
$8-$12/sq ft · 2 days
Metallic Epoxy Floors
Showrooms, retail and salon floors
$12-$18/sq ft · 3 days
Flake Epoxy Systems
Garages, shops and mechanical rooms
$8-$12/sq ft · 2 days
Polyaspartic Coatings
Homeowners who cannot lose the garage for three days
$10-$15/sq ft · 1 day
Polished Concrete
Retail, restaurants and commercial interiors
$6-$14/sq ft · 3-5 days
Commercial & Industrial Epoxy
Warehouses, distribution and manufacturing
$6-$14/sq ft · 2-5 days
Quartz Broadcast Systems
Commercial kitchens and food processing
$11-$16/sq ft · 3-4 days
Concrete Repair & Surface Prep
Slabs being prepped for any coating or polish
$2-$6/sq ft · 1-2 days
Neighbourhoods we work in
Vernon. FAQ
Does Apex Concrete Coating Ltd. serve Vernon?
Yes. Apex is based in Kelowna and works throughout Vernon and the wider North Okanagan, about 45 minutes from Kelowna. Confirm site-visit availability, travel and the written scope for your location.
How much does an epoxy garage floor cost in Vernon?
A full-flake epoxy system with polyaspartic topcoat runs $8-$12 per square foot in Vernon, so a standard 2-car garage of about 500 sq ft is $4,000-$6,000. These are indicative planning figures. Preparation, access, travel and the selected system affect the written quote.
How long does a coating job take in Vernon?
Two days for a standard flake garage floor, one day for a full polyaspartic build, and three to five days for metallic, quartz or polished concrete. For commercial work in Vernon, discuss overnight, weekend or phased access. The selected products and site conditions determine when each area can reopen.
What documentation should I request before work starts?
Ask for the insurance, licensing and workplace coverage documents relevant to your project, along with the written scope and any product-specific warranty terms. Confirm these before booking.